[K12OSN] New EL6 install
Les Mikesell
lesmikesell at gmail.com
Fri Aug 26 19:05:12 UTC 2011
On Fri, Aug 26, 2011 at 1:46 PM, Jomegat <jomegat at jomegat.com> wrote:
> I did see some really strange things during the initial setup. The real
> head-scratcher was that I bought a managed switch on eBay a while back and
> decided to try it out here. It was to replace the 10/100 switch between my
> TC's and terminal server. The new switch has 24 10/100 ports and a pair of
> gigE ports. The new switch appears to work in every regard except - no TC
> can boot through it. For now I am stuck with my old 10/100 switch. The
> managed switch is a Dell PowerConnect 3024 (if memory serves), so if anyone
> knows how to coax that into working between a cluster of TC's and a terminal
> server, I'm all ears.
Switches are supposed to do a spanning-tree check as new nodes appear
and may block for 30 seconds or so - which may be long enough for a
PXE boot attempt to time out and restart the cycle. Look for a
command to do 'rapid' spanning tree or to forward while learning.
--
Les Mikesell
lesmikesell at gmail.com
More information about the K12OSN
mailing list